01Monolith House
A single poured mass on a coastal ridge. Three rooms, one view, no corridors.
Private residence · Lisbon · 2025
Architecture · Industrial design · Lisbon / Oslo
A studio for buildings, objects and the materials between them. Twelve people, two cities, one standard.
01 — Practice
Wetakeabriefandremoveeverythingthatisnotload-bearing.Whatremainsisabuilding,oranobject,thatcouldnotbeanysimplerandstillbeitself.Theworkisquietbecausethedecisionsareloud.
02 — Disciplines
Houses, cultural rooms and workplaces from first sketch through site. We stay on the project until the last fixing is set.
Concept · Planning · Detail · Site
Objects that are honest about how they are made. Tooling, alloys and finishes chosen in the workshop, not the deck.
Research · Prototype · Tooling · Launch
A library of tested finishes, from board-formed concrete to oxidised bronze, specified once and reused with intent.
Sampling · Weathering · Specification
03 — Selected work
Imagery shown is placeholder plate photography; studio photography drops into the same frames.
01A single poured mass on a coastal ridge. Three rooms, one view, no corridors.
Private residence · Lisbon · 2025
02A reading room cut from a former grain silo, lit entirely from above.
Cultural · Copenhagen · 2024
03A cantilevered stair resolved to a single folded plate of weathering steel.
Fabrication · Studio · 2024
04Forty metres of exposed truss, tuned so the wind plays it rather than fights it.
Public structure · Rotterdam · 2023
05Flatware forged from one alloy so the hand reads weight before shape.
Industrial design · Milan · 2025
06A studio for forty with no fixed desks and one twenty-metre window.
Workplace · Oslo · 2023
04 — Material library




05 — Process
Fixed-fee stages with a decision at the end of each. You can stop at any gate and keep everything made so far.
One week on site and in the archive. We leave with the real brief, which is rarely the written one.
Three schemes, then one. Every element has to earn its place structurally or it goes.
Samples weathered on the roof for a season. Finishes are chosen by hand and by rain.
Drawings to the tolerance the trade can actually hold. A partner on site every fortnight until handover.
06 — Start a project
Three short steps. A partner reads every brief and replies within two working days. No account, no newsletter.
Or book directly